”I consider Johnson Electric to be the best Electrical Contractor that I have ever worked with.”
Barry Orem, Project Manager
Vannoy Construction
 
view more testimonials
 
 
 
 
 
 
 
 
 
 
 
SAMSUNG CALL CENTER  
 
Main Image
 
Client: Samsung Call Center Location: 356 Centerpoint Blvd., Simpsonville, SC 29681 Project Type: Design Build General Contractor: BE&K Building Group Project Details: 80,000 sq ft, fast track design build for new facility completed in 4.5 months, 60,000 sq ft raised floor area with UPS and Generator backup – 350 KW for call center